Loading... please wait!
  
   
 
     
   

Emergency Operating Procedure For Uncontrolled Withdrawal of Absorber Rods/ Regulating Rods/ Shim Rods


Published By: Krishna Dubey
Description: This following PDF provided by study India contains Emergency Operating Procedure For Uncontrolled Withdrawal of Absorber Rods/ Regulating Rods/ Shim Rods. These Notes are based on Emergency Operating Procedure of RAPS , COIS Points , Absorber Rod (AR) Positions and Disturbance Recoding System (DRS).

Pages:23 Size:0.947 MB Total Views:12

File Perview





X

Share To Download


Button
X


Title:
Emergency Operating Procedure For Uncontrolled Withdrawal of Absorber Rods/ Regulating Rods/ Shim Rods


Posted By:
Krishna Dubey


Date:
2/25/2016 5:05:01 AM


Comment: