Loading... please wait!
  
   
 
     
   

Emergency Operating Procedure For Reactor Header Level Control Failure


Published By: Krishna Dubey
Description: This following PDF provided by study India contains Emergency Operating Procedure For Reactor Header Level Control Failure . These Notes are based on Mechanical Failure of Pump or Coupling , Heavy Water of PHT System and End Shield Cooling System.

Pages:19 Size:0.178 MB Total Views:37

File Perview





X

Share To Download


Button
X


Title:
Emergency Operating Procedure For Reactor Header Level Control Failure


Posted By:
Krishna Dubey


Date:
2/25/2016 3:37:55 AM


Comment: