Loading... please wait!
  
   
 
     
   

Failure Of Coolant Channel End Fitting Concurrent With Ejection of Fuel Bundles


Published By: Krishna Dubey
Description: This following PDF provided by study India contains Failure Of Coolant Channel End Fitting Concurrent With Ejection of Fuel Bundles. These Notes are based on Seal Plug Failure , RB Isolation Test , Primary Containment Filtration & Pump Back (PCFPB) System and Inner Containment Wall (ICW).

Pages:22 Size:0.290 MB Total Views:17

File Perview





X

Share To Download


Button
X


Title:
Failure Of Coolant Channel End Fitting Concurrent With Ejection of Fuel Bundles


Posted By:
Krishna Dubey


Date:
2/25/2016 3:32:48 AM


Comment: